MAP Concrete Pumping Ltd - Home
 -
Putzmiester 38.5
Putzmiester 38.5
Pouring 280 cube for new yard storage yard in Leicester
38m and 50m
Pouring 500 cube in Coventry town centre
38m and 50m
Putzmiester 38m and Cifa 39m
Putzmiester 38m and Cifa 39m
Pouring 500 cube for a new wind farm in north wales
Putzmiester 38m and Sermac 32m
Pouring 450cube in to wall for a new bridge over railway on Newtown bypass
Putzmiester 38m and Sermac 32m
Cifa 39m
Cifa 39m
Pouring the base for canal refurbishment in Brecon
Putzmiester 24m
Our 24m is pumping concrete through 80m of pipeline under the railway line in to the back of 32m . Poured 450 cube with 3 pumps in 7 hours
Putzmiester 24m
2x 24m and 32m
2x 24m and 32m
24m is pouring through 80m of pipeline underneath railway into 32m because of restricted access to pour 450 cube into base for new railway bridge
Putzmiester 38m
Making easy work of 260 cube floor slab for new retail park in selly oak
Putzmiester 38m
Cifa 50m
Cifa 50m
Filling old caves in iron bridge
38m and 50m
Pouring 500 cube new student accommodation in Coventry town centre
38m and 50m
Putzmiester 38.5
Putzmiester 38.5
At maximum reach
Cifa 39m
Pouring blinding for new bridge construction in Newtown
Cifa 39m
Putzmiester 38m
Putzmiester 38m
New storm tank in Malvern
Cifa M50
Pouring new roof slab at burton town hall
Cifa M50
Putz 24.4
Pouring floor slab at jaguar Land Rover in Solihull
Putz 24.4
Residential
Residential
Pouring new floor in to house in West Brom
Putzmiester 20.4
Floors for new office block in reditch
Putzmiester 20.4
Putzmiester 20
Putzmiester 20
Pouring bases for new animal inclosure at twycross zoo
Cifa 39m
39m on standby to our 50m and 42m during a 1600m pour at derby for new incinerator
Cifa 39m
Residential
Residential
Pouring footings for house exstention in Wolverhampton
Putzmiester 31.5
Pouring 350 cube for a new floor slab in Kidderminster
Putzmiester 31.5
Putzmiester 42m
Putzmiester 42m
Pouring 450 cube in to slab for the new Genting Arena
Putzmiester 42
Pouring lift shaft for new Genting Arena at NEC Birmingham
Putzmiester 42
Residential
Residential
Putzmiester 20.3 section
Sermac
Making easy work of 200 cube in steel factory in Wolverhampton
Sermac
Putzmiester 20
Putzmiester 20
Pouring concrete into basement at Fort retail park Birmingham
Putzmiester 20m
Birmingham
Putzmiester 20m
Our first pump
Our first pump
This was the first pump I bought 11 years ago
Commercial
Pouring agilia into first floor office
Commercial
WWFC
WWFC
Placing concrete for new advertising boards along side of pitch
Residential
House foundation in Stratford
Residential
Commercial
Commercial
Machine base in a factory in redditch




 